This Project consisted of Bridge and Deck repairs on I-90 and I-294 and Noise Wall replacement on I-294. The bridge repairs varied from expansion joint replacement, partial and full depth deck repairs, bridge bearing replacement, structural repairs to bridge piers and abutments, and cleaning and painting existing bridge bearings. This work was performed under staged construction. A large portion of the work was performed with overnight lane closures requiring close coordination with the Illinois Tollway.