This project consisted of the construction of a fourth lane and shoulder and the placement of a four inch bituminous concrete overlay for the entire length of the project. R & G Engineering was responsible for inspecting the electrical work, pavement patching, and dowel bar retrofits required to add a fourth lane of traffic to the existing I-355 roadway.